fbpx

Job

International Hydrometric Network Expert for Integrated climate-resilient transboundary flood risk management in the Drin River basin in the Western Balkans (Drin FRM project)

International Hydrometric Network Expert for Integrated climate-resilient transboundary flood risk management in the Drin River basin in the Western Balkans (Drin FRM project)

Language:
Type of offer:
Consultancy
Description

UNDP is implementing an Adaptation Fund-funded project “Integrated climate-resilient transboundary flood risk management in the Drin River basin in the Western Balkans (Albania, Montenegro and North Macedonia)” (hereinafter Drin FRM Project). The project aims to assist the riparian countries in the implementation of an integrated climate-resilient river basin flood risk management approach in order to improve their existing capacity to manage flood risk at regional, national and local levels and to enhance resilience of vulnerable communities in the Drin River Basin (DRB) to climate-induced floods. The following results shall be achieved: (i) Improved climate and risk informed decision-making, availability and use of climate risk information; (ii) Improved institutional arrangements, legislative and policy framework for climate-resilient flood risk management (FRM), and development of climate change adaptation (CCA) and FRM strategy and plans at the basin, sub-basin, national and sub-national levels; (iii) Strengthened community resilience through improved flood management, through implementation of structural and non-structural measures and enhanced local capacity for CCA and FRM.

Outcome 1 of the project is aimed at achieving an improved climate and risk informed decision-making, availability and use of climate risk information. Key to the strategic management of climate-induced flood risk is to have appropriate density and frequency of monitoring of important hydrometeorological variables. Given the importance of accurate historical hydrometeorological records in the assessment of flood risk, as well as further statistical data treatment, necessary documented lessons from flood events, and also considering that relevant data are required for flood forecasting over the Drin River Basin (DRB), it would be important to ensure that the hydrometric network is spatially optimized and centrally managed, and that data is made available to all flood management practitioners.

Location: home based with at least 6 missions to Albania, Montenegro, North Macedonia, ALBANIA
Organization: UNDP
Deadline: October 26, 2020
External website link: https://jobs.undp.org/cj_view_job.cfm?cur_job_id=94618